+34 603 138 302

Legalization · Costa Blanca

Legalization

Installed your own system, or have an existing one? We handle the paperwork — permits, distributor registration, IVACE grant applications.

Costa Blanca villa

Whether the system was installed by someone else, by yourself, or simply never registered, we step in and complete the paperwork that turns it into a fully legal, grant-eligible install. Send the documentation you have on WhatsApp; we'll tell you what's missing.

Permits

Town hall (ayuntamiento) permits and CAU/legalisation filings, prepared and submitted on your behalf — no Spanish bureaucracy on your kitchen table.

Distributor registration

Registration with the local electricity distributor so self-consumption is recognised, surplus compensation is enabled, and the install appears on the official record.

IVACE grant applications

Where eligible, we prepare and submit IVACE and regional grant applications, including the technical files and energy-label documentation the grants require.

Frequently asked questions

Can I install solar panels myself or do I need an installer?
You can assemble the mounting structure and place the panels yourself, and our shop stocks all the components. However, in Spain the electrical connection and the legalisation of a self-consumption system must be carried out and signed off by an authorised installer (boletín/CIE). Without that certificate you cannot legalise the installation or qualify for surplus compensation. Many customers buy the material from us and hire only the electrical work and legalisation.
My solar installation is not yet legalised — who can arrange that?
Innovadoras legalises photovoltaic installations, including those built by another company or by yourself. A technician inspects the system, verifies it meets the REBT regulations, issues the electrical certificate (CIE) and handles the self-consumption registration with the grid operator and the regional authority. This gives you a legal installation, entitled to surplus compensation and covered by insurance. Send us your installation details and we will prepare a legalisation quote.
What is legalisation of a solar installation and why is it required?
Legalising means officially registering your installation with the authorities and the electricity company. In Spain it is mandatory for self-consumption: it certifies the installation is safe (meets the REBT), lets you export and offset surplus energy, and avoids penalties. The process includes the electrical certificate (CIE), the technical report, the installation certificate and the self-consumption registration. Innovadoras handles all the paperwork for you.